Lbk2000 160t/H Mini Quick-Install Asphalt Mixing Equipment

Customization: Available
After-sales Service: Engineers Available to Service Machinery Overseas
Application Area: Building Construction

Product Description

i

Basic Specifications

Model NO.LBK2000
Capacity15m³/h & Above
CertificationCCC, CE, GOST, ISO
ConditionNew
Main MaterialAlloy Steel, Aluminum, Carbon Steel, Cast Iron
Power SourceDiesel
Stirring TypeDiving
Warranty1 year
P

Product Description

LBK2000 160T/H Mini Quick-install Asphalt Mixing Equipment

Model LBG1500 LBG2000 LBG3000 LBG4000 LBG5000
Cold silo (Qty × Capacity) 4×10m³ 5×15m³ 5×20m³ 6×20m³ 6×20m³
Drum Size (D × L) 1.8m×7.5m 2.25m×9m 2.5m×10m 2.8m×11m 2.9m×12.5m
Max Drying Capacity 120t/h 160t/h 240t/h 320t/h 400t/h
Fuel Options Light Oil / Heavy Oil / Natural Gas (Optional)
Dust Removal First-level gravity dust removal + second-stage bag dust removal
Host Capacity 1.5t 2t 3t 4t 5t
Stirring Method Horizontal double-shaft forced stirring
Rated Output 120t/h 160t/h 240t/h 320t/h 400t/h

Key Technical Features

  • Protective plates on both sides of the aggregate hoppers to avoid sundries getting into the aggregates.
  • Vibrators equipped below each hopper to ensure smoother material supply.
  • Grid plates at the top of hoppers buffer shock and screen oversize aggregates.
  • Dustproof covers on conveying belts to significantly reduce dust emission.
  • Integrated belt cleaners and pinch rollers for accurate supplying and extended durability.
  • Intermediate vibrating screens to further refine aggregate sizing.
  • Advanced insufficient material alarm system for safe and uninterrupted production.
M

Equipment Gallery

F

Production Facility

?

Frequently Asked Questions

Q1: What is the rated output of the LBK2000 model? The LBK2000 model features a rated output of 160t/h with a maximum drying capacity of 160t/h at 5% moisture content.
Q2: Which fuel types can be used for the burner? The system is versatile and supports Light Oil, Heavy Oil, and Natural Gas as optional fuel sources.
Q3: What kind of dust removal system is installed? It utilizes a highly efficient two-stage system consisting of first-level gravity dust removal followed by a second-stage bag dust removal process.
Q4: What are the main materials used in construction? The equipment is built using high-durability materials including Alloy Steel, Aluminum, Carbon Steel, and Cast Iron.
Q5: Does the equipment include safety protection features? Yes, it includes Anti-Slip Feet, Emergency Stop Buttons, Overload Protection, Safety Locks, and Splash Guards for operator safety.
Q6: How does the mixing system operate? The equipment uses a horizontal double-shaft forced stirring method, ensuring a uniform and high-quality asphalt mix.

Related Products