1 / 5
| Traditional Asphalt Cold Bonding | High Viscosity Rapid Solidifying Waterproof Patch |
|---|---|
| Long curing cycle; prone to rutting, bulging, and cracking after paving. | Quick solidification. Traffic opens immediately after compaction with no ruts or swelling. |
| Summer heat causes softening due to residual solvents; requires re-laying. | Wide temperature range (-20°C to 40°C). Prevents summer softening and winter cracking via chemical transformation. |
| High porosity leads to water seepage and scattering after rain. | Superior water resistance. Adapted to rainy and humid climates with unique plasticizing characteristics. |
| Requires intensive processing. | Eco-friendly. Cold mixed throughout without heating, saving fuel and reducing carbon emissions. |
Immediate traffic access after compaction.
Stable performance from -20°C to 40°C.
Excellent resistance to rain and moisture damage.









